Hi,
Recently there was a situation where i was working with T code MC41, i want to update my material's ABC indicator and i am having about 1,00,000 materials, so to reduce the burden we have developed a BDC for this standard program and with that the ABC indicators are updated, my question is:
How this ABC indicator is being assigned it is based on single material or else the whole material since when i run MC41 for single material the proposed indicator are not same as that of when i run MC41 with say 10 to 50 materials, so the indicators are been changed when i include or exclude material in material selection, can u please explain in detail how to update the ABC indicator of these 1,00,000 materials please help me out guys.
Thanks in advance