Quantcast
Channel: SCN : Discussion List - SAP ERP - Logistics Materials Management (SAP MM)
Viewing all articles
Browse latest Browse all 7060

OBYC settings for standard price difference on IR

$
0
0

Hello,

 

I have a material which has standard price set on the material master.  Material Ledger is active.  When I have a PO where the purchase unit price is different from the standard price, a price variance is recorded in CKM3 (Material Ledger report).  However, when I have a PO where the unit price is the same as the standard price, but I change the amount on the IR using t-code MIRO, no variance is being recorded.  When I simulate the entry from MIRO there are two lines in the entry - vendor and GR/IR.

 

I have configured in OBYC the PRD transaction.  I tried it without a general modification at all, just with valuation class and debit / credit.  I also tried it with General Modification active.  According to one post I saw here, the PO should have used the entry where there is no General Modification, for which I have lines.  This is an IDES system so I was not planning on modifiying this.  However, I'm wondering if there's something I'm missing here.  With the General Modification on, I made entries for (null), PRA, PRF and PRU.

 

I have tried doing a GR before the IR, or posting the IR before the GR, with the same result.  Any suggestions would be appreciated!

 

Best,

Tony


Viewing all articles
Browse latest Browse all 7060

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>