Guys I have a question about MRP. I am attaching the documents too for your reference.In MD04 I see the Pur Req  which has requirements of 720 EA. Material has rounding value of 360 but when I see the future requirements I don't see anything which should generate requirements for 720. I am attaching MD63,MMBE,and MM04 screen shots for you reference. Following are the values from MRP1 .We use APO and values in APO matching MD63.

 

 

Material   112HGRFG1         
Plant      1024              

 

Base Unit of Measure EA       each        MRP group            Z001
Purchasing Group                          ABC Indicator        C
Plant-sp.matl status                      Valid from


MRP Type             PD     MRP
Reorder Point        0                    Planning time fence  0
Planning cycle                            MRP Controller       999


Lot size             TB     Daily lot size
Minimum Lot Size     0                    Maximum Lot Size     0
                                           Maximum stock level  0
Assembly scrap (%)   0.00                 Takt time            0
Rounding Profile                          Rounding value       360
Unit of Measure Grp