Hi Experts,
The following error pops up during overall PR release with ME54N.
ME 816 - System error (error in method initiate_Release)
This error is appearing only for 1 PR. I have not changed the release strategy recently. The changeability indicator for my release indicator is set to '4' - Changeable, new release in case of new strat. or val. change.
I have been able to release this PR at one level (Release Code 01). The second level of release causes this message.
I have not been able to locate any satisfactory answers for this in SCN. Please help.