Dear Experts,
Can you please share your inputs on below 5 points: regarding Change in PR (about each cases as detailed as possible)
1. If a PR is not approved:
-> The PR can be changed by a PR requester without delete a line item and create a new line item. Please correct me if I am wrong??
2. If a PR is approved and a PO is not created:
-> In this case, Can a PR requester change the PR without delete a line item and create a new line item??
( or it also should delete a line item and create a new line item and also needs to designate the approvers )
3. If a PR is approved and a PO is created,:
3(A). the PO is not approved,
-> First, The PO should be deleted by a buyer
-> And then, a PR requester always should delete a line item and create a new line item and also needs to designate the approvers through the UWL link. Right ?
3(B). the PO is approved,
-> First, The PO should be deleted by a buyer
-> And then, The PR requestor always should delete the line item and create a new line item and also needs to designate the approvers through the UWL link. Right ?
4. What does it mean that release strategy is at Header lever (PR)? How is it different from having release strategy at item level?
5. Lastly, If changes are made to an existing approved line item on the PR, re-approval is not required if Release strategy is at Header level ? Right?
Thanks and Regards
Rohit