Hello Experts,
We made PO for 6 inches of a plate but we receive 6.5 inches of plate when measured, reason is that its a manufacturer design (finished product). The same is the case with our Pipe and structural materials.
We are bound to GRN for 6.5 inches of plate and it gives rise to Invoice value and the same is updated in PO history. Amending the PO value and Quantity is not acceptable because it goes for many approvals and change documents and so on..
Now, the requirement is :
1. If GRN is made for more than PO quantity then the change must be updated in PO line item automatically for GRN value and quantity.
2. This automatic update should occur only when the received materials have only a maximum of +5% tolerance level.
3. It should be applicable for Plates,Pipes and Structural materials. (We are creating them under single material type)
Kindly suggest how it can be achieved. Thanks for your inputs.
Regards
Saurabh Tiwari