Quantcast
Channel: SCN : Discussion List - SAP ERP - Logistics Materials Management (SAP MM)
Viewing all 7060 articles
Browse latest View live

MIRO cancellation document

$
0
0

Dear All ,

    We have created an import PO with currency USD.

While doing MIRO we wrongly posted the rupee amount as USD .So we had to reverse the document .But in reverse document when I am trying to see account document the value corresponding to  Customs provision is getting posted to 2 accounts which are 1)Customs provision and other 2) Cons Raw material import.

     I want to know why this account is going to consumption in raw material account.In my view it should directly go to customs Provision .

Regards

Abhijit Das


Planned GI Date same as STO PO Delivery Date

$
0
0


Hello Gurus,

 

I am facing a problem in our SAP Production system.

We have the STO scenario implemented in our SAP system.

Whenever our users create Outbound Delivery Documents with reference to the STO PO using VL10H transaction, the Planned GI Date in OBD is coming up same as that of the Delivery Date mentioned in the STO PO.

For example, if the Delivery date is maintained as 20.12.2014 in STO PO, the same date is populating in OBD Planned GI Date field.

 

However, my client's requirement is that, this Planned GI Date should be calculated with the Planned Delivery Time maintained in the MMR or Info Record and the correct date should be populated in OBD Planned GI Date field.

For example, if the Delivery Date in PO is 20.12.2014 and the Planned Delivery Time is maintained as 5 days in the Info Record for the relevant material/plant combination, the Planned GI Date in the Outbound Delivery Document should be 20.12.2014 - 5 days = 15.12.2014.

 

Please let me know how this requirement can be met.

Your earliest response would be very much helpful to me.

 

Thanks and Regards,

Umakanth

Error during PO creation.

$
0
0

Dear Gurus,

 

I am trying to create a PO by batch job, but every error message is coming:-Net Value in USD becomes 0 (please check your input).

I have checked the purchase nfo record and every thing is correct.

 

Please help me to solve this problem.

 

BR

Ashish Arora

How to inform about invocing items in PO with valuated GR ?

$
0
0

Hi!!

 

I would like to be able to inform about different invoicing ítems but I need also to use valuated GR. It would be enough if it was posible to use invoicing plan in PO line. We just need to be able to insert in PO line the different invoicing ítems we have agreed with the provider. We do not need automatic creation of invoice.

 

It would be very interesting also to be able to see from miro transaction wether the PO it is going to be used has these invoicing ítems.

What could be the way to do that?

 

Thanks in advance.

Changing describtion in GI

$
0
0


Hello,

 

When I am doing  GI MvT 201 I would like to use one material and have a possibility to change material description, but now when I want to change the material description system is trying to find material with such description  not allowing me to change the descirption and leaving the same material number.

Could you please advise on it ?

 

Regards

M

can i create a Blank (B) PO assign to PR via ME58 ?

$
0
0

hello

 

I had a situation, which i have to create a blank PR ,  then to change it to Blank  PP  in a simple way, as  ME58 or  ME59.

 

I don't receive the PR in the list for create  the PO.

 

Can i get some help please?

 

Thank you in advance.

 

Judith

ZEBP_ADRNR maintenance

$
0
0

Hi can anyone help me with the below issue

I need to maintain header and invoice address in ZEBP_ADRNR of a company code in two different languages English and polish.polish is the local language as the address which needs to be maintained for polland and as international language English needs to be maintained when I maintain international version and save the language automatically changes to polish language but the address remains correct.how to over come this.also when I test by creating a PO by taking local vendor from polland and in print preview I see header and invoice address in Polish language where as if I take a vendor from say India the address in the print preview is still in Polish language which is not correct as it has to be in English because it's not the local vendor

 

Thanks in advance

STR visibility in MD04

$
0
0

Hello Experts,

 

I'm facing a stranger problem, when I execute MD04, all STR which are created through MRP are visible however if the user create manual STR, the result of MD04 is not display the manual STR

 

Appreciate your quick reply.

 

Regards,


Moving Average Price Issue on External Processing Process

$
0
0

Hello Experts,

 

We are creating a production order of Semi Finished Good maintained on Moving Average Basis with control key PP02 in defined in routing.

 

To create 1.86 M of Semi-Finished Good, 2.05 M of Raw material is Required

 

Upon creation of Production Order using TCode Co01, Purchase Requisition is created with reference to the production order for external processing.

 

Purchase Requisition has been generated from Production Planning which is subsequently converted into Purchase Order

 

Purchase Order has been created with Net Price 65 and PO Quantity 3720 M.

Components quantities which are issued to Vendor are 4100 M having Moving Average 112.

 

Material 10001005 with quantity 4100 M has been issued to Vendor.

 

Good Receipt has been performed for the process and afterwards GR done against Production order for the Semi Finished

 

It is expected that the cost 701000 which is the summation of 

Component Cost 4100 M x 112 = 459200 (consumed at GR of process)

Processing Cost 3720 M x 65 = 241800 (consumed at GR of process)

must be commutate on Semi Finished Product which is confirmed on Production order.

But in actual, system is adding Moving Average Price of components issued and processing cost = 112+ 65 = 177 and multiplying it with GR quantity of Production order.

 

4100 M is issued quantity Moving Average 112 and 3720 is receiving quantity of Semi Finish.

 

The difference between above two quantities is (4100 – 3720 = 380; take moving average 112.) 380 x 112 = 42560 which is exactly the same amount system does not load on material to correct the moving average (188.44) and load it as a variance on PP order.

Conversion from vertex to sabrix

$
0
0


Hi there,

 

We are converting from Vertex to Sabrix. We are using conversion programs as per OSS NOTE#409562. In this note SAP says to create your own ZZ* program, but it alos m,entions that this program is not supported by SAP. Has anyone used this program for conversion of tax jurisdiction codes.

 

How was the experirnce as far as Errors and validations are concerned.

 

Also can anyone explain difefrence between program RSADRQU1 and RSADRQU1N.

 

Could you please let us know. We woudl appreciate your response.

business area has been deleted, why it's showing in a " error message " ?

$
0
0

Hi all ,

 

I've faced a strange problem during initial stock upload with 501 mvt. type by MB1C t.code ...

 

it display ICPL business area is not defined .

 

Now , the thing is that - ICPL business area has been deleted and already, created a new business area and maintained all necessary setting and assignment with respective sales area ...

 

My query is - if the previous business area (ICPL)  has already deleted , then why it's showing in a " error message " ? ...

 

 

reagards ,

 

patel .

 

mb1c.jpg

 

Message was edited by: Jürgen L

UoM of a BOM Component for Subcontracting Process

$
0
0

Hi Experts,

 

We have a component that its UoM is setup incorrectly where the base UoM (EA) is not the smallest unit.

With that said, here is the situation.

This component is being used to build parent material A, B, etc.

The qty. needed to build material A is 1/4 EA and 1/3 EA for material B.

To reflect this, I setup alt. UoM, SH (4 SH = 1 EA) and PAC (3 PAC = 1 EA).

I then updated a BOM for material A with 'SH' as the component's UoM.

Next, I tried to update a BOM for material B with UoM 'PAC' then SAP issued this error.

 

"Unit of measure PAC not supported for material 'B' in plant ####" (message # 29175)

 

After a research, I found that the Unit of Issue (UoI) in the master need to be set as 'PAC' to avoid the above error.

So I tried to change UoI in the master and got another error message.

 

"The unit of issue cannot be changed because the material is used in a BOM" (M3214)

 

I deleted all existing BOM of a component having 'SH' as UoM but still getting the same error M3214.

Is there a way to maintain a component in BOMs with more than one UoM?

The bottom line here is to update subcontracting POs with the correct BOM.

 

Any input or suggestion would be very appreciated!

 

Regards,
Eddie

Error in Variant

$
0
0

Hi All,

 

Please help to create a variant for ME91F T code...in screen i have given all the inputs like PO,Pur Org,Pur group Doc type and i have selected 2 tabs list untransmitted messages and save and generate messages, but while creating variant it is taking only one tab ( save and generate messages) . i want both tabs in variant. please help.

 

Thanks

how to restrict material which have 103 movement type in ERS

$
0
0


Hi Gurus,



We are facing problem that Our client follows 103-105 MT procedure for GRN. For some vendors, ERS is activated and the same is activated in some SA. The requirement is to create automatic invoice through MRRL for GR with MT 105 only. However, a zero value invoice is getting generated for 103 MT also, which client does not want. Is there any configuration available to prevent generation of Invoice through ERS for 103  movement type.



Please suggest how can resolve this.




Regards,

Sanjay Verma



Shipping Notification for Plant and storage location

$
0
0

Hello Gurus,

 

I have a requirement for Intra company (UB), I want to configure the shipping notification (CCK) for the based on supplying plant, Receiving plant and storage location should populate automatically. Could you please let me know how can we configure and what are prerequisite

 

Thanks for your support

 

Regards

Madan


mb5b

$
0
0

Hi,

 

Please confirm if the following is possible in standard T-code mb5b

 

1. Whenever I execute the T-code mb5b all my default setting should get display like

 

Code - XYZ

Plant - ABC

Date - 01.12.2014 to 12.12.2014

 

Display layout - ZTEST

 

All the above field should come as by default.

 

2. Can I add User Name as a selection screen in standard mb5b T-code.

 

 

Please confirm is it possible.

 

Regards,

Field Selection

$
0
0

Dear All,

 

I need to provide mandatory entry for the following fields in Costing View 1 in material master for ERSA material type.

 

MBEW-EKALR

MBEW-HKMAT

 

The field selection grp found to be 41,but in that group other fields also gets mandatory which business does not need.

Please advice.

 

Best Regards

VigneshCV

Access to PR Change (ME52N) with restrictions

$
0
0

My client has a requirement to grant ME52N (PR Change) access to buyers with a restriction that they should not be able to add or delete a PR item. How can this be acheived.

 

iqbal

Subcontract process error - Not possible to determine any components Message no. ME154

$
0
0

Hello

 

I am testing subcontract process.

 

1. The BOM exists in CS03

2. Modified the BOM to add a by product by adding the quantity with "- minus" sign

3. The above change is valid from 01st Dec 2014

4. Source list, info record are verified, material mrp2 have procurement type = "F" and spl procurement = "30"

5. PO created with item category "L" and delivery date is 24th Dec. (Searched in SCN and changed the delivery date)

6. While saving the PO, the error faced as " Not possible to determine any components - Message no. ME154"

 

Please give your views

 

Thanks

 

Eswaras

LSMW Direct input RM06IBI0

$
0
0

Hi all,

we have to load purchasing info record using direct-input RM06IBI0 in LSMW transaction.

 

We have a doubt , for each line of structure BKONP is it possible to link just 1 line of structure BKONM? Or more than one?

 

If more, how can we link each line of BKONP with corresponding BKONM lines?

 

Thanks in advance.

Regards.

Dario.

Viewing all 7060 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>